Case Study
Bi-Directional MFL application
Pipeline Description:
36” – 9 km long tanker un-loading pipeline, connecting the offshore pipeline end manifold with the tank farm onshore.
Why is it challenging?
Access to the pipeline is only possible at the onshore end of the pipeline.
Target of the inspection:
Perform a high resolution MFL inspection. As a special issue, study defects in the vicinity of girth welds.
Request Download
Enter your contact information and we will send you the requested file soon.

