Case Study
Launch from a pigging valve
Pipeline Description:
16” – 4058m refined product pipeline connecting an import terminal with a storage depot.
Why is it challenging?
Various refined hydrocarbon products are imported through this pipeline: JET A-1, diesel, and premium grade gasoline. The pipeline was constructed without consideration for internal pig-based inspection. Pigging was foreseen only to permit batching pigs to be launched to separate different products. Batching pigs are launched from a 3-way trap valve. This installation does not allow launch of typical ILI tools.
Target of the inspection:
High resolution geometric (GEO), mapping (XYZ) and metal loss (MFL) inspection.
Download anfordern
Geben Sie Ihre Kontaktdaten ein und wir senden Ihnen die angeforderte Datei zu.

