Case Study
Bi-directinal MFL application
Pipeline Description:
36” – 9 km long tanker un-loading pipeline, connecting the offshore pipeline end manifold with the tank farm onshore.
Why is it challenging?
Access to the pipeline is only possible at the onshore end of the pipeline.
Target of the inspection:
Perform a high resolution MFL inspection. As a special issue, study defects in the vicinity of girth welds.
Download anfordern
Geben Sie Ihre Kontaktdaten ein und wir senden Ihnen die angeforderte Datei zu.

