Read the whole story of…
…Heavy wall – small diameter ILI
We appreciate to share our knowledge and our experience with customers and business partners. Every pipeline inspection project presents new challenges and requires an adapted approach as well as individual technical solutions.
We have compiled this treasure trove of first-hand practical experience for you as a case study. There we describe our concept, our performance and the result of our ILI projects.
Pipeline Description: Offshore flowlines 4“, wall thickness ½“, designed as a hair pin loop starting from the Gannet A platform (Central North Sea), passing by two subsea production templates and back to Gannet A. The total length is 11.7 km. There are flexible riser sections at the foot of the platform and bend radius of 5D within the risers. Why is it challenging? ½” wall thickness cannot be sufficiently magnetised in a 4” pipeline. Therefore an MFL inspection is not feasible. Ultrasonic inspection tools, that could handle the wall thickness, were not available for 4”. Further, the permanent pig traps, having a length of only 1100mm, cannot be extended. Target of the inspection: Perform a high resolution inspection for internal local corrosion. Due to the project circumstances the inspection was to be performed under urgency.
Request your Case Study now! Please fill in the order form below:
We provide our case studies for free. The request for the name and company e-mail address serves the sole purpose of providing this technical project information in a targeted manner. Your personal data will not be used for any advertizing purposes.
We thank you very much for your interest. If you have any question regarding this page or regarding the projects we present in our case studies please contact us. We will be happy to answer your questions or to discuss technical issues with you.
Call us
+49 5908 2656 120