Read the whole story of…
…16″ heavy wall and pipe-in-pipe
We appreciate to share our knowledge and our experience with customers and business partners. Every pipeline inspection project presents new challenges and requires an adapted approach as well as individual technical solutions.
We have compiled this treasure trove of first-hand practical experience for you as a case study. There we describe our concept, our performance and the result of our ILI projects.
Pipeline Description: 16” x 10km looped oil production and produced water reinjection pipeline system. Why is it challenging? Since commissioning in 2008 this pipeline system had never been inspected before. It is difficult to inspect by means of in-line inspection tools due to presence of heavy wall thickness of 25.4mm / 27.94mm (in bends), the 16” / 20” pipe-in-pipe construction and due to no centring spacers installed at regular intervals in the PIP section. Target of the inspection: Determine the current condition and mechanical integrity of the pipeline system regarding metal loss, girth weld anomalies and other features. In addition an XYZ survey was part of the inspection to obtain a vertical profile of the line system and to get geographic coordinates of each girth weld and all other reported features.
Request your Case Study now! Please fill in the order form below:
We provide our case studies for free. The request for the name and company e-mail address serves the sole purpose of providing this technical project information in a targeted manner. Your personal data will not be used for any advertizing purposes.
We thank you very much for your interest. If you have any question regarding this page or regarding the projects we present in our case studies please contact us. We will be happy to answer your questions or to discuss technical issues with you.
Call us
+49 5908 2656 120